MARINE SURVEY INC • Based across all 50 U.S. states • Operating Nationwide With Accredited Surveyor Partners in All 50 States
Surveys: survey@marinesurveyusa.com  |  Contact: contact@marinesurveyusa.com
MARINE-SURVEY Logo
Standards & Methodology

The Complete Guide to Marine Surveys

Understanding SAMS, ABYC, USCG (33 & 46 CFR), and NFPA-302 inspection protocols—plus a full sample Condition & Value survey report.

How Our Marine Surveys Are Conducted

Every survey conducted by MARINE SURVEY INC follows mandatory United States Coast Guard regulations (33 & 46 CFR) alongside voluntary standards established by the American Boat and Yacht Council (ABYC) and the National Fire Protection Association (NFPA-302).

  • Exterior Hull & Bottom: Gelcoat inspection, percussion hammer sounding, moisture meter readings (Electrophysics GRP-33), osmotic blistering check, keel-to-hull joint, rudder swing, shafts, struts, and zinc anodes.
  • Top Deck & Superstructure: Cored deck moisture scanning around stanchion bases, cleats, windlass, bow pulpit, escape hatches, and cockpit scupper drainage.
  • Interior Hull & Structural: Hull-to-deck flange fasteners, stringer grid tabbing, bulkheads, bilge cleanliness, and below-waterline bronze seacock valves.
  • Electrical, Propulsion & Tankage: 12V/24V DC battery terminal barriers & tie-downs (33 CFR 183.420), 120V/240V AC shore power & GFCI polarity, USCG Type A1 fuel hoses, MSD holding tank compliance (33 CFR 159.7), and oil analysis.
Accredited marine surveyor examining hull gelcoat and structural condition
Sample SAMS Condition & Value Report

REPORT OF MARINE SURVEY — PRE-PURCHASE CONDITION & VALUE

Conducted by: MARINE SURVEY INC (All 50 U.S. States — Partner Network) • Website: marinesurveyusa.com • Email: survey@marinesurveyusa.com
Report File #: MSI-FL-2026-0914
Survey Type: Afloat & Hauled-Out Inspection
Guidelines: SAMS / USCG 33 & 46 CFR / ABYC / NFPA-302

1. Survey Scope & General Vessel Information

Vessel Inspected 31 ft Auxiliary Coastal Cruiser / Sloop (Reference Sample) Purpose of Survey Pre-Purchase Condition & Fair Market Valuation
Survey Method Inspected while afloat and hauled out in slings Moisture & Thermal Instrumentation Electrophysics Model GRP-33 Moisture Meter & FLIR Thermal Camera
Hull Construction Hand-laid molded fiberglass with cored top deck Propulsion & Steering Inboard Marine Diesel (Freshwater cooled) • Wheel & Quadrant Steering
Overall Condition Rating AVERAGE / ABOVE AVERAGE CONDITION Suitability for Service Fit for Intended Service upon Priority I corrections

2. Survey Table of Contents & Inspected Systems

Exterior Hull & Bottom

Sides, stem, rub rail, transom, bottom paint, blister check, keel joint, propeller, shaft & rudder.

Top Deck & Cockpit

Non-skid deck, stanchions, lifelines, bow pulpit, anchor locker, hatches, ports & cockpit scuppers.

Interior Structural & Seacocks

Hull-to-deck fasteners, FRP stringers, athwartship bulkheads, bilge spaces & bronze seacock ball valves.

Electrical Systems (DC & AC)

12V battery bank securing & terminal covers, charging system, 30A shore power, reverse polarity & GFCI.

Propulsion, Steering & Tankage

Engine mounts, exhaust double-clamping, stuffing box, USCG Type A1 fuel hoses, fresh water & MSD Type III tank.

USCG & NFPA Safety Audit

Navigation lights, PFDs, visual distress signals, sound device, oil/MARPOL placards, fire extinguishers & CO detectors.

3. Inspection Recommendations Summary (Color-Coded Priority Schema)

PRIORITY I (RED) — Safety & Regulatory Recommendations (Mandatory)
  • DC Electrical (33 CFR 183.420): Install insulated covers over all positive battery terminals and secure battery boxes against movement exceeding 1 inch in any direction.
  • Marine Sanitation Device (33 CFR 159.7): Disable overboard Y-valve discharge by closing the bronze seacock and securing with a non-releasable wire tie or removing the handle.
  • USCG Safety & Placards (33 CFR 175.110 / 155.450): Place current-dated USCG visual distress signals aboard and mount 5"x8" Oil Discharge and MARPOL Trash Disposal placards.
  • Electric Bilge Pumps: Service discharge hose obstruction so bilge water ejects properly in both automatic float and manual helm modes.
PRIORITY II (BLUE) — Maintenance & ABYC / NFPA Standards Recommendations
  • DC Battery Connections (ABYC E-10.8.3): Replace wing nuts on 6 AWG and larger battery conductors with stainless steel hex nuts and lock washers; install acid-containment trays.
  • Deck Hardware & Moisture Readings: Re-bed port #3 stanchion base and seal hairline gelcoat stress cracks where localized elevated moisture readings were recorded.
  • Carbon Monoxide Detection (ABYC A-24 / NFPA-302): Install marine-listed carbon monoxide alarms inside enclosed accommodation spaces.
PRIORITY III (GREEN) — Surveyor Observations & Value Preservation
  • Hull Cosmetics & Bottom Paint: Compound and wax topside gelcoat to remove minor dock scuffs; spot-sand and touch up flaking anti-fouling bottom paint prior to relaunch.
  • Cockpit & Deck Drainage: Clear leaf debris from cockpit scupper drains and anchor locker stem drain.
Commission Your Own Standard ($399.00) or Premium ($1,299.00) Survey